| Cleared Site from NW corner-1 |
Laid Service Pipelines |
SBR Excavation 4 |
 |
 |
 |
| SBR Blinding 3 |
SBR complete reo |
Recycled Water PS Pour Floor slab |
 |
 |
 |
| SBR Pour PET Wall |
WAS & RAS Pipework Fabrication |
Reuse Pipework excavation to Reuse Pond B |
 |
 |
 |
| Sludge Lagoon 3 Trim floor |
Cable Basement Constr |
Reuse Pond B HPE Installation Weld Join |
 |
 |
 |
| Reuse Pond B HPE Installation-4 |
Amenities Site |
Supernatant PS Pipe Penetrations |
 |
 |
 |
| Reuse Pond B Full-1 |
Reuse Pond A Site-2 |
Site from NW cor 1 |
 |
 |
 |
| Sewerage Plant Construction 19 |
Amenities Site |
Chem Dosing Abrasive Blasting |
 |
 |
 |
| Reuse Pond B |
SBR Anoxic Tank |
SBR Install Epoxy |
 |
 |
 |
| Super PS Internal |
SBR Anoxic Tank |
SBR PET Hydro test |
 |
 |
 |
| Site from NW |
SL3 Site |
IWS Inlet Pit |
 |
 |
 |
| Electrical Conduits from NW cor Amenties |
SBR Anoxic Tank |
SBR install epoxy |
 |
 |
 |
| SBR PET Hydro test |
SL3 Pipe plinth reo |
Supernatant PS Lid |
 |
 |
 |
| Filter Pit and UV Slab |
SBR Restricted Space |
Elect Conduits from Pit 3 |
 |
 |
 |
| IWs Inlet Pipework |
IWs Install inlet Pipework |
Site south from IWs |
 |
 |
 |
| Supernatant PS Pipework |
IWs Bin Slab reo |
RWPS Pipework |
 |
 |
 |
| IWs Grit Arrestor |
IWs Pour Bin Slab |
Chem Dosing installation |
 |
 |
 |
| Paint bottom fence posts |
RAS Electrical installation |
Supernatant PS Site |
 |
 |
 |
| Testing Equipment |
Amenities Switchroom Site |
Inlet Works epoxy installation |